Plywood Sheathing for Roof
Made for one job: the roof deck. Built for weeks open to rain before shingling, then snow, wind and foot traffic. Exterior-bond glue, sealed edges, tongue-and-groove joints and printed nailing lines are available; thickness and edge style can be tailored.
Request a Quote →| Sheet Size | 2440 × 1220 mm |
| Thickness Range | 12 / 15 / 18 mm |
| Thickness Tolerance | ±0.5 mm |
| Length and Width Tolerance | ±3 mm |
| Warp | ≤ 1% |
| Moisture Content | 6–12% |
| Rafter Spacing Guide | 12 mm up to about 400 mm; 15–18 mm up to about 600 mm |
| Options | Thickness, edge, marking and face adjustable |
Why Roof Crews Specify Yufu
Exterior Phenolic Glue
Glue lines stay bonded through repeated wet-dry cycles while the roof waits for its covering.
Tongue-and-Groove Joints
T&G locks sheets and supports edges between rafters, with no clips. Square-edge also available.
Load-Conscious Build
Thickness set by rafter spacing and local snow and wind load; stiff enough for nail guns and bundles.
Roof Diaphragm Support
Helps transfer lateral forces from wind and seismic activity to the building's structural framework.
Roofs Where This Deck Panel Fits
Plywood vs OSB on a Roof Deck
On roofs the difference shows up in exposure and edge behaviour.
- Long Exposure: Plywood dries faster and swells less at the edges, suiting rain delays
- Shingle Appearance: Less edge swelling avoids ridging under shingles and thin membranes
- Fastener Holding: Holds nails well near the edge, where uplift concentrates
- Budget: OSB is often cheaper, suiting dry-season jobs with short exposure
Why Choose Yufu?
Langfang Dehou Wood Industry Co., Ltd., established in 2016, specializes in construction formwork plywood.
- Experience: Years of plywood production.
- Capacity: About 50,000 m³ per year.
- Equipment: Veneer processing, pressing, cutting, surface treatment.
- Technology: Multiple utility model patents.
- Bulk Supply: Ready for wholesale and project orders.
Frequently Asked Questions
How much expansion gap between sheets?
About 3 mm at edges and ends, including end joints on T&G edges.
Can sheathing be left exposed to rain?
Briefly. Cover with underlayment soon, and let soaked panels dry first to avoid trapped moisture and cupping.
How should fixing change near eaves, ridges and gables?
Ring-shank nails about 50 mm, roughly 150 mm apart on supported edges and 300 mm in the field; tighten spacing in high-uplift zones per local code.
How do I know if old sheathing needs replacing?
Spongy spots, dark staining, sagging between rafters or daylight from the attic. Replace rather than shingle over.
Which direction should sheets run?
Long side across rafters, end joints staggered by at least one rafter spacing, every end on framing.