Langfang Dehou Wood Industry Co., Ltd.
Products  /  Plywood Cement Forms
Yufu

Plywood Cement Forms

Cross-laminated veneer panels from Yufu for ordinary concrete casting: foundations, beams, columns and walls. Easy to cut, align and brace, with surface treatment matched to your project.

$ Request Quote

Yufu · Formwork Plywood

Plywood Cement Forms

Plywood panels for ordinary concrete casting and structural formwork. With suitable supporting frames, they contain fresh concrete and hold its shape for foundations, beams, columns and walls.

Request a Quote →
Main Material Wood Veneer Plywood
Panel Construction Cross-Laminated Veneer Layers
Primary Function Temporary Concrete Formwork
Applicable Structures Foundations, Beams, Columns, and Walls
Supporting Components Timber Studs, Braces, and Fasteners
Surface Treatment Selected According to Project Requirements
Edge Protection Recommended After Cutting
Specification Options Customizable According to Project Requirements

Key Product Features

01

Practical Forming Surface

A working surface to contain fresh concrete; alignment affects consistency.

02

Works with Supporting Frames

Studs, braces and fasteners spread concrete pressure and limit movement.

03

Flexible Cutting and Layout

Cut to suit different dimensions with fewer joints and less waste.

04

Cross-Laminated Veneers

Alternating grain layers for general concrete forming.

Main Applications

Foundation Formwork: Temporary boundaries that hold shape during the pour.
Beam and Column Casting: Position and support to suit structural dimensions and pressure.
Ordinary Concrete Walls: Standard structural walls where accurate shaping matters most.
Precast Components: Selected precast work using temporary plywood molds.
Used with suitable supporting frames; follow structural and concrete pressure requirements.

A Practical Panel for Everyday Concrete Construction

For foundations, beams, columns and standard walls, consistent results depend on how the panels are arranged and supported.

  • Panel Layout: Plan before cutting
  • Joint Control: Tight, aligned joints
  • Support Spacing: Set by pressure and pour height
  • Pre-Pour Check: Inspect connections and edges

Why Choose Yufu?

Langfang Dehou Wood Industry Co., Ltd., established in 2016, specializes in construction formwork plywood.

  • Experience: Years of plywood production.
  • Capacity: About 50,000 m³ per year.
  • Equipment: Veneer processing, pressing, cutting, surface treatment.
  • Technology: Multiple utility model patents.
  • Bulk Supply: Ready for wholesale and project orders.

Frequently Asked Questions

How should supports be arranged?

Set spacing by panel thickness, concrete pressure, pour height and placement speed, so panels do not deflect.

What causes concrete leakage?

Gaps at joints, poorly aligned corners and loose connections. Check them before pouring.

How can panel waste be reduced?

Plan the layout before cutting and reuse offcuts for smaller sections.

Can it be used for garden walls?

Yes, when panel arrangement and supports suit the wall dimensions.

Why check formwork before pouring?

Loose connections, damaged edges and weak bracing affect shape and stability.

Request a quote

Tell us the size, thickness, quantity and destination port. We reply with a mill-direct price, lead time and loading plan.

Get a Quote WhatsApp